TECHNICAL SERVICE TRAINING
TECHNICAL SERVICE TRAINING
Welcome to another
Welcome to another
Scotsman
Scotsman
technical
technical
service
service
presentation. This one will cover the MC
presentation. This one will cover the MC
Series Ice Cube Machines models
Series Ice Cube Machines models
MC 15, MC 45
MC 15, MC 45
and
and
MC 1210.
MC 1210.
MC SERIES
MC SERIES
CUBERS
CUBERS
Vista de página 0
1 2 3 4 5 6 ... 135 136

Resumo do Conteúdo

Página 1 - MC SERIES

TECHNICAL SERVICE TRAININGTECHNICAL SERVICE TRAININGWelcome to anotherWelcome to another Scotsman Scotsman technical technical service service present

Página 2 - MC 15 + B 350

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKING UNPACKING•• INSTALLATION INSTALLATION••

Página 3 - MC 45 + B 550

TERMINALBOARDTERMINALBOARDCONDENSERSENSOR SOCKETCONDENSERSENSOR SOCKETOPTICAL ICE LEVELCONTROLSENSORSOCKETOPTICAL ICE LEVELCONTROLSENSORSOCKETMICROPRO

Página 4 - MC 1210 + B 120

SWITCH 9OPERATING TIMEOF WATER PUMPDURING HARVESTOFF = 15”ON = 30”SWITCH 9OPERATING TIMEOF WATER PUMPDURING HARVESTOFF = 15”ON = 30”SWITCH 7 AND 8EXTE

Página 5

OPERATING PRINCIPLES - PC BOARDOPERATING PRINCIPLES - PC BOARDTime TTime T11From startup offreezingcycle till theblinking of0°C RedLEDMC SERIESMC SERI

Página 6

OPERATING PRINCIPLES - PC BOARDOPERATING PRINCIPLES - PC BOARDTime TTime T22Fromblinking ofRed LEDtill the lightON steadyof -15°CRed LEDMC SERIESMC SE

Página 7

OPERATING PRINCIPLES - PC BOARDOPERATING PRINCIPLES - PC BOARDTime TTime TaaAdded time controlled bythe PC Board accordingto the setting of the DIPSWI

Página 8

OPERATING PRINCIPLES - PC BOARDOPERATING PRINCIPLES - PC BOARDTime TTime TssHarvest Time TS iscontrolled by the PCBoard and it is inverselyproportiona

Página 9

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSIt’s possible to extend the length of the harvest cycle (Te) bymeans of the DIP SWITCH 7

Página 10

OPERATING PRINCIPLES - PC BOARDOPERATING PRINCIPLES - PC BOARDTime TTime TaaTime TTime T11+T+T22TimeTimeTTssFreezing = TFreezing = T11 + T + T22 + +

Página 11 - UNPACKING

OPERATING PRINCIPLES - ALARMOPERATING PRINCIPLES - ALARMWhenever thecondensing temperaturerise up to 70ºC (aircooled version) or 60ºC(water cooled ver

Página 12

OPERATING PRINCIPLES - ALARMOPERATING PRINCIPLES - ALARMIn case the evaporatingtemperature remainshigher then 0ºC after 15minutes from thebeginning of

Página 13

UNPACKINGUNPACKINGUNPACKINGMC SERIESMC SERIES

Página 14

OPERATING PRINCIPLES - ALARMOPERATING PRINCIPLES - ALARMIn case both theRed and YellowLED are lightON steady thecondenser sensor isout of order andnee

Página 15

OPERATING PRINCIPLES - ALARMOPERATING PRINCIPLES - ALARMIn case both theRed and YellowLED areblinking theevaporator sensoris out of order andneed to b

Página 16

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULLAs soon as theice cubes are inbetween thetransmitter andreceiver sensorof the OpticalIce

Página 17

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULL….immediatelythe Bin FullYellow LEDstarts to blinkand after…..FREEZING CYCLEBIN FULLPOWE

Página 18

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULL….one minutethe PC Boardswitch OFF theentire machinewith the lightON of BINFULL YellowLE

Página 19 - INSTALLATION

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULLWhen ice isscooped outfrom thestorage bin….MC SERIESMC SERIES

Página 20

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULL…. after six-sevenseconds the machinerestart in theoperation from thebeginning of thefre

Página 21

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULL….….or from theharvest cycle whenthe evaporatingtemperature isbelow 0ºC in orderto avoid

Página 22

OPERATING PRINCIPLES - POWER OFFOPERATING PRINCIPLES - POWER OFFIn case of black out in power the machine re-starts (when poweris back) through the 5

Página 23

OPERATING PRINCIPLES - POWER OFFOPERATING PRINCIPLES - POWER OFFIn case of black out in power the machine re-starts (when poweris back) through the 5

Página 24

MC SERIESMC SERIESUNPACKINGUNPACKINGThe machines are suppliedin a carton box secured bytwo plastic strips to awooden base. Check firstthe outside cond

Página 25

MC SERIESMC SERIESThe components of the refrigerantsystem of the MC series Models arecomposed by:••COMPRESSORCOMPRESSORLOCATION OF REFRIGERANT COMPONE

Página 26

MC SERIESMC SERIES• COMPRESSOR••CONDENSERCONDENSERLOCATION OF REFRIGERANT COMPONENTSLOCATION OF REFRIGERANT COMPONENTSCOMPONENTS - REFRIGERANT SYSTEMC

Página 27

MC SERIESMC SERIESLOCATION OF REFRIGERANT COMPONENTSLOCATION OF REFRIGERANT COMPONENTSCOMPONENTS - REFRIGERANT SYSTEMCOMPONENTS - REFRIGERANT SYSTEM•

Página 28

MC SERIESMC SERIES• COMPRESSOR• CONDENSER• EVAPORATOR••SUCTION LINE ANDSUCTION LINE ANDCAPILLARY TUBECAPILLARY TUBELOCATION OF REFRIGERANT COMPONENTSL

Página 29

MC SERIESMC SERIES• COMPRESSOR• CONDENSER• EVAPORATOR• SUCTION LINE ANDCAPILLARY TUBE••DRIERDRIERLOCATION OF REFRIGERANT COMPONENTSLOCATION OF REFRIGE

Página 30

MC SERIESMC SERIES• COMPRESSOR• CONDENSER• EVAPORATOR• SUCTION LINE AND CAPILLARYTUBE• DRIER••HOT GAS VALVEHOT GAS VALVELOCATION OF REFRIGERANT COMPON

Página 31

MC SERIESMC SERIESCOMPONENTS - WATER SYSTEMCOMPONENTS - WATER SYSTEMThe components of the water systemof the MC Series Models arecomposed by:•• WATER

Página 32

MC SERIESMC SERIES• WATER INLET VALVE•• WATER SUMPWATER SUMPCOMPONENTS - WATER SYSTEMCOMPONENTS - WATER SYSTEM

Página 33

MC SERIESMC SERIES• WATER INLET VALVE• WATER SUMP•• WATER PUMPWATER PUMPCOMPONENTS - WATER SYSTEMCOMPONENTS - WATER SYSTEM

Página 34 - MC 15-45

MC SERIESMC SERIES• WATER INLETVALVE• WATER SUMP• WATER PUMP•• SPRAY BARSPRAY BARCOMPONENTS - WATER SYSTEMCOMPONENTS - WATER SYSTEM

Página 35

MC SERIESMC SERIESUNPACKINGUNPACKINGVisuallyinspect theexterior of themachine thenremove thetwo sidepanels……………..and thevertical icechute…..

Página 36

MC SERIESMC SERIES• WATER INLETVALVE• WATER SUMP• WATER PUMP• SPRAY BAR•• OVERFLOWOVERFLOWCOMPONENTS - WATER SYSTEMCOMPONENTS - WATER SYSTEM

Página 37 - COLD AIR

MC SERIESMC SERIES• WATER INLETVALVE• WATER SUMP• WATER PUMP• SPRAY BAR• OVERFLOW•• WATER DRAINWATER DRAINVALVEVALVECOMPONENTS - WATER SYSTEMCOMPONEN

Página 38 - MC 15 + MC 45

MC SERIESMC SERIESCOMPONENTS - ELECTRONIC CONTROLSCOMPONENTS - ELECTRONIC CONTROLSThe components ofthe ElectronicSystem of the MCSeries Models arecomp

Página 39

MC SERIESMC SERIESCOMPONENTS - ELECTRONIC CONTROLSCOMPONENTS - ELECTRONIC CONTROLS• PC BOARD••EVAPORATOREVAPORATORSENSORSENSOR

Página 40

MC SERIESMC SERIESCOMPONENTS - ELECTRONIC CONTROLSCOMPONENTS - ELECTRONIC CONTROLS• PC BOARD• EVAPORATORSENSOR••CONDENSERCONDENSERSENSORSENSOR

Página 41

MC SERIESMC SERIESCOMPONENTS - ELECTRONIC CONTROLSCOMPONENTS - ELECTRONIC CONTROLS• PC BOARD• EVAPORATORSENSOR• CONDENSERSENSOR••OPTICAL ICEOPTICAL IC

Página 42

END FIRSTEND FIRSTHALFHALFMC SERIESMC SERIES

Página 43

MC SERIESMC SERIESUNPACKINGUNPACKING…..unscrewthe unit framefrom thewoodenbase….

Página 44

MC SERIESMC SERIESUNPACKINGUNPACKING…..then removefrom the inside ofthe machine all thepolystyreneprotection as wellas the….…..the Optical IceLevel Co

Página 45 - STACKING INSTALLATION

MC SERIESMC SERIESUNPACKINGUNPACKINGThe Modular Cubermachines require for theinstallation the use of acompanion storage binto store the iceproduced.St

Página 46

MC SERIESMC SERIESUNPACKINGUNPACKINGUnpack thestorage bin andvisually inspectthe exterior thenremove fromthe inside thecarton boxcontaining theplastic

Página 47

MC SERIESMC SERIESUNPACKINGUNPACKINGUnloose the two screws holdingthe drain fitting protection andremove it

Página 48

INSTALLATIONINSTALLATIONINSTALLATIONMC SERIESMC SERIES

Página 49

MC 15 + B 350MC 15 + B 350

Página 50

MC SERIESMC SERIESInstall the fourlegs sockets onthe bottom baseof the storage binas well as themetal legs.INSTALLATIONINSTALLATION

Página 51

MC SERIESMC SERIESPlace the storage binin its definitivelocation then installon top of the same theice machine.INSTALLATIONINSTALLATION

Página 52

MC SERIESMC SERIESPlacebetweenthemachineand thestorage binthe metalbracket ofthe IceLevelControl.INSTALLATIONINSTALLATION

Página 53

MC SERIESMC SERIESSecure themachine tothe storagebin by meansof the twoscrewssupplied.INSTALLATIONINSTALLATION

Página 54

MC SERIESMC SERIESInsert thetwo plasticclips into thetwo squareholes of theS.S. bracketthen ….INSTALLATIONINSTALLATION

Página 55

MC SERIESMC SERIES……cut the plastic stripsecuring the Optical IceLevel Control to the suctionline of the machine.INSTALLATIONINSTALLATION

Página 56

MC SERIESMC SERIESCut the rubber pluglocated on the right side ofthe ice chute rectangularopening then….INSTALLATIONINSTALLATION

Página 57

MC SERIESMC SERIES…..drive downinto the storagebin the OpticalIce Level Controland secure it withthe two screwssupplied with themachine.INSTALLATIONIN

Página 58

MC SERIESMC SERIESInstall on theupper front sideof the Ice Chuterectangularopening the IceCubes plasticdeflectorsupplied withthe storage binpay attent

Página 59

MC SERIESMC SERIES….. properlyhook it onthe frontedge.INSTALLATIONINSTALLATION

Página 60

MC 45 + B 550MC 45 + B 550

Página 61

MC SERIESMC SERIESInstall againthe verticalice chutewith itscover…..INSTALLATIONINSTALLATION

Página 62

MC SERIESMC SERIES….. payingattention tohook it on theupper side ofthe evaporatoropening .INSTALLATIONINSTALLATION

Página 63

MC SERIESMC SERIESINSTALLATIONINSTALLATIONCheck the data plateof the machinelocated on the rearpanel for correctvoltage as well as forthe proper wirin

Página 64

MC SERIESMC SERIESINSTALLATIONINSTALLATIONCheck for the correct water and ambient conditions that should be:• Min. ambient temperature 10ºC (50F)• Max

Página 65

MC 15-45MC 15-45INSTALLATIONINSTALLATIONAdequatespace must leftbe for properwater andelectricalconnections onthe rear side ofthe machine. Aminimumclea

Página 66

COLD AIRCOLD AIRHOT AIRHOT AIRINSTALLATION - AIR CIRCULATIONINSTALLATION - AIR CIRCULATIONCONDENSERFAN MOTORCOMPRESSORICE CHUTEOPENINGMC 15-45MC 15-45

Página 67

MC 1210MC 1210INSTALLATIONINSTALLATIONAdequate spacemust be left forproper water andelectricalconnections onthe rear side ofthe machine aswell as for

Página 68

COLD AIRCOLD AIRHOT AIRHOT AIRINSTALLATION - AIR CIRCULATIONINSTALLATION - AIR CIRCULATIONCOMPRESSORCOMPRESSORFAN MOTORCONDENSERICE CHUTEOPENINGICE CH

Página 69

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATION

Página 70

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONFor the Stakinginstallation aproper kit - KSC11 - is required.It consists of:• Ice

Página 71

MC 1210 + B 120MC 1210 + B 120

Página 72

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATION• Ice connecting chute/s• Interface PC Boardsmade by SYEN…….. and by Pro.El.Ind.

Página 73

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATION• Ice connecting chute/s• Interface PC Board• Gasket

Página 74

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATION• Ice connecting chute/s• Interface PC Board• Gasket• Extension optical cable

Página 75

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONThe Ice connectingchute/s must be installedthrough the bottomrectangular opening o

Página 76

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONThe Interface PCBoard must beinstalled in the bottommachine. The OpticalIce Level

Página 77

STACKING INSTALLATIONSTACKING INSTALLATIONICE LEVELCONTROLICE LEVELCONTROLMAIN PCBOARDMAIN PCBOARDINTERFACEPC BOARDINTERFACEPC BOARDMAIN PCBOARDMAIN P

Página 78

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONATTENTION!!!It is IMPERATIVE that all the three PC Boards (Ice Machines ones + the

Página 79

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONThe gaskets must beinstalled in the spaceremaining between thebottom base of theup

Página 80

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONThe Extension cable must be usedonly when a current Electronicmachine is installed

Página 81

MC SERIESMC SERIESINSTALLATIONINSTALLATIONLevel the unit on bothdirections front torear and right to leftside using theadjustable legs.

Página 82

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKINGUNPACKING•• INSTALLATION INSTALLATION••

Página 83

MC SERIESMC SERIESINSTALLATION - ELECTRICALINSTALLATION - ELECTRICALInstall, on the cable supplywith the machine, anadaguate electrical plugaccording

Página 84

MC SERIESMC SERIESINSTALLATION - WATER ININSTALLATION - WATER INConnect the water inlet 3/4”male threat of the water inletsolenoid valve to the waters

Página 85

MC SERIESMC SERIESINSTALLATION - WATER DRAININSTALLATION - WATER DRAINConnect the 20 mm O.D. fitting (2on model MC 45) of the waterdrain with the flex

Página 86

MC SERIESMC SERIESTYPICAL INSTALLATIONTYPICAL INSTALLATIONPOWERWATER INLETWATER DRAINHAND DISCONNECTSWITCHWATERFILTERWATERVALVEWATER DRAINAIR COOLEDAI

Página 87

MC SERIESMC SERIESINSTALLATION - WATER ININSTALLATION - WATER INOn the water cooledversion there is aseparate 3/4” malethread water inlet fittingconne

Página 88

MC SERIESMC SERIESINSTALLATION - WATER OUTINSTALLATION - WATER OUT…..a second separate drainhose must be connected tothe outlet 3/4” male fittinglocat

Página 89

MC SERIESMC SERIESTYPICAL INSTALLATIONTYPICAL INSTALLATIONPOWERWATER INLETWATER DRAINHAND DISCONNECTSWITCHWATERFILTERWATERVALVEWATER DRAINWATER COOLED

Página 90

START UP ANDOPERATIONALCHECKSSTART UP ANDSTART UP ANDOPERATIONALOPERATIONALCHECKSCHECKSMC SERIESMC SERIES

Página 91

• Open the water tap/valve. • Switch ON the power on theelectrical supply line.START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIES

Página 92

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SERIESThe Ice Machine will start up automatically through the 5 minutes“Wate

Página 93

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKING UNPACKING•• INSTALLATIONINSTALLATION••

Página 94

The components energizedduring the first 5’ are:• PC BoardPC BoardSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SERIES

Página 95

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSThe components energized duringthe first 5’ are:• PC Board• Water Inlet Solenoid ValveWa

Página 96

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSThe components energizedduring the first 5’ are:•PC Board• Water Inlet SolenoidValve••Wa

Página 97

The components energizedduring the first 5’ are:• PC Board• Water Inlet Solenoid Valve• Water Drain/PurgeSolenoid Valve• Hot Gas SolenoidHot Gas Solen

Página 98

During the first 5’ the watergoes through the Water InletValve then….….flows into the small orificeof the “Flow Control” locatedon the outlet port of

Página 99

Following the copper inlet tubethe incoming water arrive on theupper side of the evaporator…... where it flows onto the plasticevaporator platen dri

Página 100

Dribbled water iscollected down intothe water sumpwhere is locatedthe overflow standpipe that assuresthe proper waterlevel and quantityfor the nextfre

Página 101

After the first 5’ of water fillingphase the machine start upautomatically on freezing cyclewith the following electricalcomponents in operation:• Com

Página 102

• Compressor• Water PumpSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SERIES

Página 103

• Compressor• Water Pump• Fan Motor (on air cooledversion only)START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SERIES

Página 104

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKING UNPACKING•• INSTALLATION INSTALLATION••

Página 105

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKS• Compressor• Water Pump• Fan Motor (on air cooledversion only)•ContactorMC SERIESMC SE

Página 106

The operation of thefan motor is controlledby a condensertemperature sensorlocated within the finsof condenser thattransmit a signal to thePC Board

Página 107

On PC Board the LED energized are:• PowerSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSFREEZING CYCLEBIN FULLPOWERTOO HI EVAP TEMPTOO

Página 108

On PC Board the LED energized are:• Power• FreezingSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSFREEZING CYCLEBIN FULLPOWERTOO HI EVA

Página 109

Water iscirculating bythe water pumpinto the invertedtin plated coppermolds of theevaporator….START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL

Página 110

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKS….while therefrigerant isflowing intothe serpentinewelded on theupper side ofthe tin pla

Página 111

Afterapproximately 5minutes after thestart up of thefreezing cycle, thetemperature of theevaporatorserpentine dropsdown to 0ºC….START UP AND OPERATION

Página 112

….with the blinking of the small RED LED located in the center ofPC Board.START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SE

Página 113

Approximately 5minutes thetemperature of theevaporatorserpentine dropsdown to - 15ºC….START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKS-1

Página 114

….with the light ON steady of the small RED LED located in thecenter of PC Board.START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERI

Página 115

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKING UNPACKING•• INSTALLATION INSTALLATION••

Página 116

The machine remains inthe freezing cycle till itscompletion for anadditional timeaccording to the set up ofthe first four DIPSWITCH of the PCBoard.STA

Página 117

Once completed the freezing cyclethe machine enters into thedefrost or harvest cycle with thefollowing electrical componentsin operation:••CompressorC

Página 118

• Compressor••Water Inlet Solenoid valveWater Inlet Solenoid valveSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SERIES

Página 119

• Compressor• Water Inlet Solenoidvalve••Water Drain/PurgeWater Drain/PurgeSolenoid ValveSolenoid ValveSTART UP AND OPERATIONAL CHECKSSTART UP AND OPE

Página 120

• Compressor• Water Inlet Solenoid valve• Water Drain/Purge SolenoidValve••Hot Gas ValveHot Gas ValveSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERA

Página 121

According to the setting ofthe DIP SWITCH no 9 theWater Pump can remain inoperation to discharge thewater not used on theprevious freezing cycleduring

Página 122

….15” of theharvest cycle whenthe DIP SWITCH isin OFF position or30” when in ONposition.START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKS

Página 123

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSThe length of thedefrost or harvestcycle iscontrolled by thePC Boardaccording to thesett

Página 124

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKS…..the time that themachine takes to dropthe evaporatingtemperature from 0ºCto -15ºC (ti

Página 125

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSIt’s possible to extend the length of the defrost cycle by means ofthe DIP SWITCH 7 and

Página 126

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKING UNPACKING•• INSTALLATION INSTALLATION••

Página 127

During the defrostor harvest cyclethe combinedaction ofrefrigerant in HotGas state andincoming Waterare going topartially melt theice cubes incontact

Página 128

Holding anhand full ofice cubesbetween theI/R OpticalIce LevelSensor duringthe defrostcycle it ispossible totest itsoperation.START UP AND OPERATIONAL

Página 129

The Bin Full YELLOW LED starts to blink.START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSFREEZING CYCLEBIN FULLPOWERTOO HI EVAP TEMPTOO H

Página 130

After 1 minute of continuous interruption of the infrared beam betweentransmitter and received (Bin Full YELLOW LED always blinking) themachine switch

Página 131

OPERATINGPRINCIPLESandCOMPONENTSOPERATINGOPERATINGPRINCIPLESPRINCIPLESandandCOMPONENTSCOMPONENTSMC SERIESMC SERIES

Página 132

OPERATING PRINCIPLES - FREEZEOPERATING PRINCIPLES - FREEZECompressorCompressorEvaporatorEvaporatorAir cooledAir cooledcondensercondenserHotHotgasgasva

Página 133

OPERATING PRINCIPLES - HARVESTOPERATING PRINCIPLES - HARVESTCompressorCompressorEvaporatorEvaporatorAir cooledAir cooledcondensercondenserHotHotgasgas

Página 134

MC SERIESMC SERIESWATER SYSTEM - FREEZEWATER SYSTEM - FREEZE

Página 135

MC SERIESMC SERIESWATER SYSTEM - HARVESTWATER SYSTEM - HARVESTFIRST PORTION 30”FIRST PORTION 30”

Página 136 - END FIRST

MC SERIESMC SERIESWATER SYSTEM - HARVESTWATER SYSTEM - HARVESTSECOND PORTIONSECOND PORTION